巴陵石化合成橡胶事业部新建年产6万吨特种锂系聚合物项目精制单元装置现场,当班人员在闷热天气下在整改消缺,恢复机泵运行。
With an annual output of 60000 tons of special lithium polymer project into the drive stage
Baling Petrochemical synthetic rubber division to build an annual output of 60000 tons of special type of lithium polymer project refining unit operator on duty field, in hot weather in the rectification of defects elimination, recovery pump operation.